  • DEPI Public Land Bridge Replacement Package

    • Client: DEPI
    • Contract value: $1.3M
    • Completion date: In progress
    • Capability: Design and construct

    The design and construction of 5 crossing structures for DEPI at various sites across Victoria.

  • Western Highway Lochiel

    • Client: Hindmarsh Shire
    • Contract value: $1.2M
    • Completion date: In progress
    • Capability: Construct

    Upgrade of the railing of two bridges on the Western Highway, over the Wimmera River, at Lochiel.

  • Avendrina Road Bridge

    • Client: Murray Shire Council
    • Completion date: In progress
    • Capability: Construct

    Supply and construction of a dual lane two span bridge over Bullatale Creek on Avendrina Road. All precast manufactured in compliance with RMS specifications.

  • Allambee Estate Road Bridge

    • Client: South Gippsland Shire Council
    • Completion date: In progress
    • Capability: Construct

    Replacement of the bridge on Allambee Estate Road, including the manufacture, supply and installation of all of the precast components.

  • Colligen Creek Road

    • Client: Murray Shire
    • Completion date: In progress
    • Capability: Construct

    Supply and construct of a two span concrete bridge over Colligen Creek on Colligen Creek Road. All precast manufactured in compliance with RMS specifications.